Leamington Air ConditioningHeating and cooling01926 967778
  1. Home
  2. Guides
  3. Planning rules

Compared with its sources on 5 November 2026

Does air conditioning need planning permission?

Not if you are fitting a reversible unit to a house and it meets every permitted development condition. A cooling-only unit, a listed building, a road-facing wall in a conservation area, or a flat above a shop will all change the answer. This guide covers England, including what that means in Leamington Spa.

Get a quote

Name, number, postcode. We call you back to talk it through.

Enquiries are shared only with the team who quotes for and does the work. Your details are used to deal with this request only (privacy notice).

What must a unit do to count as permitted development?

ConditionHouseBlock of flats
Must not be used solely for coolingYesYes
Installed to MCS 020(a)YesYes
Outdoor unit size limit1.5 cubic metres0.6 cubic metres
How many are coveredFirst unit, or first two if detachedFirst unit, block must be wholly flats
Pitched roofNoNo
Flat roofAt least 1 metre from the edgeAt least 1 metre from the edge

Every position must also, so far as practicable, limit the effect on the look of the building and the area. A unit no longer needed for heating has to come down as soon as reasonably practicable. Source: Planning Portal.

Why does a reversible unit get treated differently?

These rights were written for heating. Since 29 May 2025 air-to-air heat pumps can use them even though they also cool, but the unit must not be used solely for cooling. That means a cooling-only system has no route through permitted development, and you should expect to apply. Sources: MCS; Planning Portal.

Where can an outdoor unit go in a conservation area?

Not on a wall or roof facing a highway, and no nearer to a bounding highway than any part of the building. That effectively moves the unit to the back or to a well-set-back side wall.

Plan of a terraced house by a road: in a conservation area the wall facing the road and the ground in front of it are ruled out under permitted development, while the rear remains possible
A terrace from overhead. Conservation area rules push the outdoor unit to the rear. A listed building needs consent wherever it goes.

Outside a conservation area, the wall above ground-floor level is excluded if it faces a highway. Leamington's conservation area covers much of the town centre, across 37 character areas in the council's guide. Warwick, Kenilworth, Stratford, Coventry, Rugby and Solihull all have their own areas, listed on our areas page. Sources: Planning Portal; Warwick District Council.

Why do flats above shops fall outside the rules?

Because the rights for flats apply only to a building made up wholly of flats, so it cannot also contain commercial premises. On Regent Street, Clemens Street, Warwick Street and other mixed streets in town, that takes many first and second floors out of permitted development altogether. Expect to apply, and get the freeholder on side first. The flats guide has more. Source: Planning Portal.

How loud can the outdoor unit be?

Permitted development depends on MCS 020(a), which calculates the sound level at a point next to the neighbouring building's nearest door or window. The calculated figure has to be 37 dB(A) or less. Barriers and careful positioning can help a unit pass. Since 28 May 2026 the Planning Portal has listed MCS 020(a) as the only permitted scheme, so ask to see the sum for your own unit. Sources: Grant UK; Planning Portal.

What can take your rights away without you noticing?

A condition on your home's original planning permission, an Article 4 direction, or another local restriction. All three can remove permitted development, and they do not always show up on a quick search. Newer estates are worth checking, and the Leamington guide lists Article 4 controls on paint colours in several streets. Ask Warwick District Council, or whichever council covers you, if you are unsure. Sources: Planning Portal; Warwick District Council.

What about businesses and listed buildings?

Businesses should plan on applying, since the Planning Portal says air source heat pumps on non-domestic land are likely to need permission. Listed buildings get no permitted development within their grounds, and need listed building consent as well. See commercial air conditioning and listed buildings. Source: Planning Portal.

Common questions

What happens if I fit one without permission when I needed it?

The council can take enforcement action, and a notice can order the unit removed. Ignoring such a notice is a criminal offence. It is much cheaper to check first.

Can I get written proof I did not need permission?

Yes. You can ask the council for a certificate of lawful development, which is useful when you sell.

Do the rules differ in Wales or Scotland?

Yes. This guide covers England only.

Sources

Before you ring

These details let us give you a better answer on the first call.

  • Your postcode
  • Flat, house or workplace
  • Whether the building is listed
  • Which rooms, roughly how big, and which way they face
  • Who owns the outside walls, if you lease or rent
Ring 01926 967778Get a quote

Want us to call you?

Tell us where you are and what is too hot or too cold. Or ring 01926 967778.

Enquiries are shared only with the team who quotes for and does the work. Your details are used to deal with this request only (privacy notice).

Ring now01926 967778Get a quoteWe call you back